| Hurricane proof waterfront house construction 2007-2009- the planning and construction process of Villa Lagoon Phase II Main House | |||||||||||
| Home | Planning | Blocks | Plans1 | Plans2 | Foundation | Site Prep | Blocks | 1st Slab | 1sr Slab | Slab Pour | |
| Acid Stain | Crane | 1st Course | 2nd Course | 3,4,5 Course | Second Pour | 1sr Floor | Crane Repair | Half Way Up | 2008 | Top Floor Joists | |
| Top Floor | Panels | Frieze | Top Floor Walls | Acid Stain Frieze | Acid Stain Con't | Cornice | Upper Story | Cornice & Panels | MgO & Evoba | Cornice & Trusses | |
| Video | Top Rows-1 | Bulkhead | Month 15 | Month 16 | Exterior Completion | Roof | Interiors-1 | Steps | Insulation & Kitchen | MgO Board | |
| Kitchen Counters | Tile Floors | Cement Tile-2 | Cabinets | Interior Decor | Cuban Ceiling | Saga of the Toilets | Interior Con't | Cement Tile 1st FL | |||
| Product Discussion Pages | |||||||||||
| Partners | DacArt in the News | Buy a Finished Dac-Art Home | Tankless Water Heaters |
Magnesium Oxide Boards-MgO | Concrete Bldg. Systems | Custom Garage Doors | Composite Decking |
House Numbers |
Concrete Floor Tile | ||
| The wiring still posed a few problems. In the master bathroom had a
situation where if you flipped the wall switch one way the center light
came on, if you flipped it the other way, the wall sconces came on. So
it was light either way. Aaron fiddled around with it and got it figured
out. Most of the fixtures still have these cheap-o bulbs that came with
them. The sconces in particular will get point-y bulbs eventually. I
like the ones with a slight blue tint to offset the yellowness of
incandescent.
|
|
|
| Over the sink the chandelier was hanging off-center. Drove me crazy. I got Aaron to take a look to see if we could move it over a bit. He said no. Ceiling joists were in the way. So, I went to Lowe's and bought an abstract flexible track light to put over the sink in the master bath. This way you can't tell that the box is off-center. We moved the little chandelier fixture over to the center of room box. I had expected to hang some way cool light there in the future but the little hanging light is great. I plant to modify the little hanging beads, change then from amber to greens to match the sink. |
|
|
|
![]() |
|
|
|
|
|
|
You can support this website by starting all Amazon purchases here, pls use our Amazon link.
07/08/2010
|
|
|
| Original Website Villa Lagoon Phase I completed in 2003 See the construction process of Phase I |
New Website-2007-2009 Phase II North Elevation w/ Frieze Construction of Phase II on this site. |