| Hurricane proof waterfront house construction 2007-2009- the planning and construction process of Villa Lagoon Phase II Main House | ||||||||||
| Home | Planning | Blocks | Plans1 | Plans2 | Foundation | Site Prep | Blocks | 1st Slab | 1sr Slab | Slab Pour |
| Acid Stain | Crane | 1st Course | 2nd Course | 3,4,5 Course | Second Pour | 1sr Floor | Crane Repair | Half Way Up | 2008 | Top Floor Joists |
| Top Floor | Panels | Frieze | Top Floor Walls | Acid Stain Frieze | Acid Stain Con't | Cornice | Upper Story | Cornice & Panels | MgO & Evoba | Cornice & Trusses |
| Video | Top Rows-1 | Bulkhead | Month 15 | Month 16 | Exterior Completion | Roof | Interiors-1 | Steps | Insulation & Kitchen | MgO Board |
| Kitchen Counters | Tile Floors | Cement Tile-2 | Cabinets | Interior Decor | Cuban Ceiling | Saga of the Toilets | ||||
| Product Discussion Pages | ||||||||||
| Partners | DacArt in the News | Buy a Finished Dac-Art Home | Tankless Water Heaters |
Magnesium Oxide Boards-MgO | Concrete Bldg. Systems | Custom Garage Doors | Composite Decking |
House Numbers |
Concrete Floor Tile | |
|
|
|
| The window trim edges that had been oversized from using older blocks are now cut and ground back to match the others. he guys were up on ladders cutting these back and they did a great job. | |
|
|
I have been experimenting with putting a light white-wash finish on the Evoba maple panels that will be the upper floor ceiling in the Lv / Kitchen area. I have tried mixing the oil based white paint with various solvents. I want something that dries fast, but not too fast. And also the finish must adhere well. So far the best results come from priming the panels with some de-glosser. Then I slap on the thin, runny paint / paint thinner mix and quickly wipe it mostly off w/ a rag. Time consuming...the panels will take the longest, the straight wood supports that go between the panels goes quickly. I can just brush it on thinly on them. |
**************
|
It has been so dry here and the weird thing is that we get rain all around us. I took this photo of big rain falling one mile away across Little Lagoon onto West Beach. We got the clouds, dark, thunder, lighting...everything but the rain. Meanwhile I have been using the well water to run sprinklers after the men quit for the day. |
![]() |
|
|
|
| Juan is working to place the blocks into our window openings that the window sills will sit on. He is in the south end of the house that already has trusses and roof decking. | |
![]() The blocks in front of the stairs are getting marked to be cut to the correct angle to follow the degree of the stairs. |
![]() Rain keeps going all around us and totally skipping us. This is a huge storm that merited TV and radio beeps. but it poured everywhere but our little stretch of Fort Morgan Road. |
![]() |
|
| The osprey hangs our near us a lot. Here he is all wet and trying to dry off in the wind. He would hold his wings in different positions to get 'full coverage'. |
|
![]() As you can see, we have a lot of trash concrete to get rid of. Mike has been pretty much piling it all together. These big cow patty looking things are where the concrete mixer trucks cleaned out their excess mix on our property. While it was still wet, the men stuck bent pieces of rebar into them so they would have handles to lift with in the end. |
The wall in front of the double staircase has been
stacked, marked for cutting, cut and re-stacked. Now the angle of the top
of the wall is the same as the stairs themselves. A solid cap block will
go along the top once the cavity has been back-filled with concrete. I
asked Mike what would keep the runny concrete mixture from seeking the
lowest point and flowing out of the lower part of the wall. He told me
that they would cut sections of cement board and epoxy them to the flat,
top surface and remove them later, before the cap blocks are installed.
|
![]() |
|
| We were suppose to have a row of decorative banding in our blocks just below the windows on this end of the house. In their enthusiasm to stack blocks, the men forgot to use those special blocks that had the detail molding into them. As a result, we are going to have to add the detail on as an appliqué. These concrete pieces have come over from the DacArt plant to be used as that horizontal row. | |
|
The steps into the front door have been formed up using inexpensive concrete masonry units. The enclosed area of porch, directly in front of the door is filled completely with sand. We have only gotten three of our DacArt steps that sit on top of the CMU's. We can get rid of some of the smaller concrete scraps in this hollow area under the stairs. |
|
| The three large panels between the windows in the master bedroom have been formed up around in order to pour some fill concrete into the space between the wall and the panels. It is gonna look like ordinary grey concrete and will need to be coated w/ a mix to have the same tone as the blocks. |
|
| Late July--We made a big push to finish the concrete acid stain designs on the frieze for the 'tower' part of the house. It is not really a tower but it is taller than the southern sections, so the workers call it that and it makes it quick to distinguish where on the house one is talking about. | It was hot and buggy early in the morning, but Dave helped and we spent 2 days finishing the last blocks that needed the concrete acid stain designs on them. |
|
|
|
![]() |
![]() I used the same stencils to trace out my pencil lines on the blocks. I had to look up at the blocks that had already been stacked to see where the design left off so I could be sure that they would match. |
![]() |
|
|
|
|
|
The workmen had made little signs to tell me where the rows would go on the building. This one says "Top south corner east wall and has an arrow to show the direction. |
|
|
|
|
![]() |
|
| We are suppose to get some
decorative parts that go above the panels between the windows. This is
why I stopped the acid stain scroll design, since that should be covered
by the applied design work.
We now have to have an inspection and then have the concrete pump truck come out again to back-fill the top rows before we add the cornice blocks. I told one of the men today that I want the hot pink tape stretched across the grass areas again. The concrete truck and the pump truck love to back up over my grass. Those heavy trucks can kill it really quickly. Plus if it has rained recently, their tires make terrible ruts. |
|
You can support this website by starting all Amazon purchases here, pls use our Amazon link.
07/01/2009
|
|
|
| Original Website Villa Lagoon Phase I completed in 2003 See the construction process of Phase I |
New Website-2007-2009 Phase II North Elevation w/ Frieze Construction of Phase II on this site. |
Contact Us : Info@VillaLagoon.com
All Contents Copyright 2005-2009
All Rights Reserved
Fort Morgan Web Development, Inc.
FortMorganInc@gmail.com