Hurricane proof waterfront house construction 2007-2009- the planning and construction process of Villa Lagoon Phase II Main House
Home Planning Blocks Plans1 Plans2 Foundation Site Prep Blocks 1st Slab 1sr Slab Slab Pour
Acid Stain Crane 1st Course 2nd Course 3,4,5 Course Second Pour 1sr Floor Crane Repair Half Way Up 2008 Top Floor Joists
Top Floor Panels Frieze Top Floor Walls Acid Stain Frieze Acid Stain Con't Cornice Upper Story Cornice & Panels MgO & Evoba Cornice & Trusses
Video Top Rows-1 Bulkhead Month 15 Month 16 Exterior Completion Roof Interiors-1 Steps Insulation & Kitchen MgO Board
Kitchen Counters Tile Floors Cement Tile-2 Cabinets Interior Decor Cuban Ceiling Saga of the Toilets        
Product Discussion Pages
Partners DacArt in the News Buy a Finished Dac-Art Home Tankless
Water Heaters
Magnesium Oxide Boards-MgO Concrete Bldg. Systems   Custom Garage Doors Composite
Decking
House
Numbers
Concrete Floor Tile

Foundation Form Preparation, Concrete Slab Pouring

Villa Lagoon house site on Gulf Coast

Concrete workers building up the forms to pour slab.

Gravel driveway leading to Villa Lagoon.

Forms are in place for our first foundation/basement slab pour. The second photo shows the new slabs position  relative to the existing guesthouse. 
Sand in place over dirt in center of the slab. Termite spray sign for inspectors to see.
The foundation /slab is being poured in 3 parts. The center section of the house was poured first.  By law, you must have termite spray treatment on your foundation and the inspectors check to see that you do. After the excavation area was sprayed, the whole thing was covered in plastic. Wood pallets were laid on top just to keep the wind from moving things around. As you can see from the sky, we have had almost daily late afternoon showers from pop-up storm clouds that come  in from out in the Gulf. Occasionally they arrive from north of us. It didn't rain here for about 6 months, and now we are getting just about daily showers.  The rebar was added and inspected. concrete arrived the next day. 
Plastic spread over footing and slab. Footings and slab ready to be covered with reinforcing wire.
I took these photos from the porch of the Phase I guesthouse. 
Summer rain storms off the Gulf of Mexico. Rebar and steel reinforcing wire in andon footing and slab area.
Very heavy rebar is going into this foundation. The lot was filled years ago and we did not have to put the foundation on pilings as the Nasellos did. The 'official' flood line is considered to be 9 feet and we are putting this building above nine feet. 
Corner detail of slab rebar and reinforcement.
Footing and slab ready for one continuous pour.
Prepared footings, foundation and slab area. The prepared foundation and slab were inspected by the City of Gulf Shores Building Inspection Dept. and are awaiting concrete delivery. 

Meanwhile, my favorite osprey, who hung out in and around my property all last year seems to be back. He is the only one who will stay put while I watch him and walk up really close to the tree he is in. The osprey's voice is a really loud CHIRP that is the only bird call I can hear thru the DAC-ART walls. 

Osprey in tree on Little Lagoon  I heard him outside while he was perched in a tree that is really close to the guest house. I went out and whistled (I wish I was a better whistler--does anyone give lessons ?) and he stops chirping and looks directly at me. While other ospreys immediately fly off, this one hangs out and we take turns chirping at each other. The next day, it was a lot sunnier and he dove and grabbed a fish right in front of us in Little Lagoon. 

Quite a thrill to watch these huge birds in action....this delightful waterfront  location provided endless amusement. 

It is hard to clearly photograph a bird in flight with an automatic camera, the camera sends out a been to auto-focus, but the bird has gone by the time the camera focuses.

 

Osprey catching a big fish in Little Lagoon

Osprey bird lifing the fish from the water.

Osprey flying along carrying his catch.

 

 

 

Home Planning Blocks Plans1 Plans2 Foundation Site Prep Blocks 1st Slab 1sr Slab Slab Pour
Acid Stain Crane 1st Course 2nd Course 3,4,5 Course Second Pour 1sr Floor Crane Repair Half Way Up 2008 Top Floor Joists
Top Floor Panels Frieze Top Floor Walls Acid Stain Frieze Acid Stain Con't Cornice Upper Story Cornice & Panels MgO & Evoba Cornice & Trusses
Video Top Rows-1 Bulkhead Month 15 Month 16 Exterior Completion Roof Interiors-1 Steps Insulation & Kitchen Plan MgO Board
Kitchen Counters Tile Floors Cement Tile-2 Cabinets Interior Decor Cuban Ceiling Saga of the Toilets       Buy a Finished Dac-Art Home
Product Discussion Pages  
  Tankless
Water Heaters
Hurricane
Windows & Doors

Composite
Decking

House
Numbers
Magnesium Oxide Boards-MgO Concrete Bldg. Systems Custom Garage Doors    

Concrete FloorTile

Click Here for house plans on the Internet!!

ehouseplans.com

You can support this website by starting all Amazon purchases here, pls use our Amazon link.

07/01/2009

Hurricane proof waterfront office and house

DAC-ART Villa on Alabama's Gulf Coast

Original Website
Villa Lagoon Phase I completed in 2003
See the construction process of Phase I
New Website-2007-2009
Phase II North Elevation w/ Frieze
Construction of Phase II on this site.

                                      
                                                                             
                                                                            