| Hurricane proof waterfront house construction 2007-2009- the planning and construction process of Villa Lagoon Phase II Main House | |||||||||||
| Home | Planning | Blocks | Plans1 | Plans2 | Foundation | Site Prep | Blocks | 1st Slab | 1sr Slab | Slab Pour | |
| Acid Stain | Crane | 1st Course | 2nd Course | 3,4,5 Course | Second Pour | 1sr Floor | Crane Repair | Half Way Up | 2008 | Top Floor Joists | |
| Top Floor | Panels | Frieze | Top Floor Walls | Acid Stain Frieze | Acid Stain Con't | Cornice | Upper Story | Cornice & Panels | MgO & Evoba | Cornice & Trusses | |
| Video | Top Rows-1 | Bulkhead | Month 15 | Month 16 | Exterior Completion | Roof | Interiors-1 | Steps | Insulation & Kitchen | MgO Board | |
| Kitchen Counters | Tile Floors | Cement Tile-2 | Cabinets | Interior Decor | Cuban Ceiling | Saga of the Toilets | Interior Con't | Cement Tile 1st FL | |||
| Product Discussion Pages | |||||||||||
| Partners | DacArt in the News | Buy a Finished Dac-Art Home | Tankless Water Heaters |
Magnesium Oxide Boards-MgO | Concrete Bldg. Systems | Custom Garage Doors | Composite Decking |
House Numbers |
Concrete Floor Tile | ||
Nov, 2007
|
The north end of the house is the garage door at ground level. The slab is poured and set. I will probably do some sort of concrete acid stain finish on it once the concrete has aged some. This will be a nice room-y garage with some storage space on both sides of the vehicle. I have a rider lawnmower that needs to fit in there too. I'm sure I will have to pull the car out to use the lawnmower, but that is no big deal to me. |
|
|
The south end of the house has a porch off
the guest room that is rather high up. It comes straight out the French
doors at that room's level. We will have to build some steps that
go down from the porch to the ground level but we will wait and see what
blocks we have left over, if any. We can always build some wood steps
until we can afford some special DAC-ART ones.
We are fortunate that the house that our blocks were originally poured for had a lot of porches and a lot of columns. It appears that we will have enuf of the 15 " hollow column blocks to make all the upper and lower porch columns that we need. |
|
| Don gives hand signals to Mike in the crane to pick up blocks from the ground and place them on the porch slab. | |
| Each column block slides over the rebar that is coming up out of the porches slab. They are then shimmed for levelness and to keep the horizontal lines matching the ones that come off the house. The upper columns will stack directly on top of these lower ones. | |
|
|
|
![]() |
![]() |
| Someone came and bush-hogged the property
next door ! It had gotten really overgrown. I wasn't around when they
did it, but they had to have used a big tractor since the terrain is
really rough, esp. near our property line where the fence got messed up
in the last big storm.
I am sooooo glad that I am building before this 10 lot subdivision housing. I had imagined that I would be having to put up with tons of dust, noise, and lots of workers overlooking my little scene over here, but since my main house is going up first, I will basically have a huge wall of privacy between me and this development. Real estate transactions are at a near stand-still down here, so it may be some time before the investors who bought these over-priced lots can sell them to end-users. |
![]() |
![]() |
|
| Michael Bates, our electrician came out and we made decisions on locating the electric outlets on the first floor. The men from New Age Stone Builders are cutting into the blocks for the duplex outlets. | ![]() |
![]() |
![]() |
| One row of blocks that went into the raised pad on the west side of the house for the air conditioner to sit on required that all the blocks be trimmed by 5 inches. This was so they would line up with the rows of blocks in the house walls. We will hold on to these cut pieces to see if they might be needed elsewhere in the construction. | |
| On a warm but overcast day I was able to
burn all my wood scraps from construction up until now. It all burned
cleanly, with no smoke. I picked a day when the wind was blowing
steadily and in a direction away from my house. We had had some recent
rain, so dryness was not a risk factor like it would have been up until
then. I got a permit from the Gulf Shores Fire Dept.
There is so little waste and scrap with DAC-ART construction.
|
![]() |
![]() |
The excess concrete is often left in a plop on the ground into which a cut piece of rebar is inserted before it sets up so that it can be easily lifted by the crane when the time comes to carry them off. See the loop lying on the ground on the upper right. |
You can support this website by starting all Amazon purchases here, pls use our Amazon link.
07/08/2010
|
|
|
| Original Website Villa Lagoon Phase I completed in 2003 See the construction process of Phase I |
New Website-2007-2009 Phase II North Elevation w/ Frieze Construction of Phase II on this site. |