| Hurricane proof waterfront house construction 2007-2009- the planning and construction process of Villa Lagoon Phase II Main House | |||||||||||
| Home | Planning | Blocks | Plans1 | Plans2 | Foundation | Site Prep | Blocks | 1st Slab | 1sr Slab | Slab Pour | |
| Acid Stain | Crane | 1st Course | 2nd Course | 3,4,5 Course | Second Pour | 1sr Floor | Crane Repair | Half Way Up | 2008 | Top Floor Joists | |
| Top Floor | Panels | Frieze | Top Floor Walls | Acid Stain Frieze | Acid Stain Con't | Cornice | Upper Story | Cornice & Panels | MgO & Evoba | Cornice & Trusses | |
| Video | Top Rows-1 | Bulkhead | Month 15 | Month 16 | Exterior Completion | Roof | Interiors-1 | Steps | Insulation & Kitchen | MgO Board | |
| Kitchen Counters | Tile Floors | Cement Tile-2 | Cabinets | Interior Decor | Cuban Ceiling | Saga of the Toilets | Interior Con't | Cement Tile 1st FL | |||
| Product Discussion Pages | |||||||||||
| Partners | DacArt in the News | Buy a Finished Dac-Art Home | Tankless Water Heaters |
Magnesium Oxide Boards-MgO | Concrete Bldg. Systems | Custom Garage Doors | Composite Decking |
House Numbers |
Concrete Floor Tile | ||
My blocks are sitting in a field in North Mississippi. These photos were scanned from some taken with a cheap camera, so they are not especially crisp. I have got to have these blocks trucked back to Alabama. My new construction is not going to require all these blocks, so we have got to figure out where we are going to put the ones we don't need, or how to pick out and load the ones we do first. I am not sure how that is all going to work out at this point.
I bought these blocks from some really nice people who had originally planned to build with DAC-ART and later changed their minds. The blocks are sitting on their property, not too far from their house.
I have received a copy of the list of blocks that were originally shipped to N. Mississippi. The folks these blocks were shipped to say that there were some discrepancies in what the list say and the actual load of blocks. Not in numbers, but dimensions, or location of openings, etc..
Mike , 'our block man' is planning to take a trip (early April 2007) up to view the blocks in person and make plans for having them trucked to Gulf Shores.
You can support this website by starting all Amazon purchases here, pls use our Amazon link.
07/08/2010
|
|
|
| Original Website Villa Lagoon Phase I completed in 2003 See the construction process of Phase I |
New Website-2007-2009 Phase II North Elevation w/ Frieze Construction of Phase II on this site. |